top of page

Fire Central Training Tower
Project Info
Foret Contracting Group completed the construction of a new three-story Fire Training Tower for Lafourche Parish Fire District No. 3. The project included a pile-supported concrete foundation, installation of a pre-engineered steel training structure, site grading, concrete paving, and exterior lighting. Designed in accordance with NFPA 1402 and 1403 standards, the facility features live-burn training rooms, rappelling and ladder drill areas, and integrated temperature monitoring systems. This modern facility provides firefighters with a safe and realistic environment to train for emergency response and enhance public safety throughout Lafourche Parish.
Project Owner
Lafourche Parish Fire
District 3
Project Location
228 Fire Central Way
Galliano, LA
Design Team
GIS, Inc.

bottom of page
.png)






